Grand Foyer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
(→Done) |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
=Things Needed= | =Things Needed= | ||
*Outlets - There are no WORKING outlets in this room. | |||
=Long Term= | =Long Term= | ||
Line 20: | Line 21: | ||
*Insulated all the light switches. | *Insulated all the light switches. | ||
*Insulated all the outlets. | *Insulated all the outlets. | ||
*Added a Wifi 6 access point (this reaches the entire house). |
Latest revision as of 19:35, 12 January 2023
Before and After Pics
Things Needed
- Outlets - There are no WORKING outlets in this room.
Long Term
- Floor - The floor is in bad shape and needs to be replaced.
- Ceiling - The acoustic tiles will have to be removed and the ceiling repaired or replaced.
- Over head light - We need to get a chandelier for this room. Right now there is a modern fixture in its place.
Done
- Cleaned radiators.
- Painted radiators.
- Filled a lot of the cracks and holes.
- Repainted all the walls.
- Repainted the stairs.
- Replaced all the light switch covers.
- Replaced all the outlet covers.
- Insulated all the light switches.
- Insulated all the outlets.
- Added a Wifi 6 access point (this reaches the entire house).