Grand Foyer: Difference between revisions

From 30 Elm St Potsdam NY
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:


=Things Needed=
=Things Needed=
[https://www.amazon.com/Linon-BH137ACA01U-Bench-Natural-Wash/dp/B07FKYNXGX/?_encoding=UTF8&pd_rd_w=56aKq&content-id=amzn1.sym.e4bd6ac6-9035-4a04-92a6-fc4ad60e09ad&pf_rd_p=e4bd6ac6-9035-4a04-92a6-fc4ad60e09ad&pf_rd_r=XGX3BZRT204XHH48P55W&pd_rd_wg=k5yp2&pd_rd_r=78c5d333-f661-4d98-9f4e-10415314c542&ref_=pd_gw_ci_mcx_mr_hp_atf_m|Linon Natural Washed Storage Frankie Bench, Seat Height of 18"] - $193.38
=Changes and Repairs=
*Walls - Skim coat
*Ceiling - Remove acoustic tiles and see damage.
*Light - Unknown


=Long Term=
=Long Term=
*'''Floor''' - Would like to replace with white tile later.
*'''Floor''' - The floor is in bad shape and needs to be replaced.
*'''Ceiling''' - The acoustic tiles will have to be removed and the ceiling repaired or replaced.
*'''Over head light''' - We need to get a chandelier for this room.  Right now there is a modern fixture in its place.


=Done=
=Done=
*Cleaned and panted the radiators.
*Filled a lot of the cracks and holes.
*Repainted all the walls.

Revision as of 19:30, 12 January 2023

Before and After Pics

GF1.png
GF2.png

Things Needed

Long Term

  • Floor - The floor is in bad shape and needs to be replaced.
  • Ceiling - The acoustic tiles will have to be removed and the ceiling repaired or replaced.
  • Over head light - We need to get a chandelier for this room. Right now there is a modern fixture in its place.

Done

  • Cleaned and panted the radiators.
  • Filled a lot of the cracks and holes.
  • Repainted all the walls.