Grand Foyer: Difference between revisions

From 30 Elm St Potsdam NY
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
=Before and After Pics=
=Before and After Pics=
[[File:GF1.png|centre|320px]]
[[File:GF1.png|centre|640px]]
[[File:GF2.png|centre|320px]]
[[File:GF2.png|centre|640px]]


=Things Needed=
=Things Needed=
Line 11: Line 11:


=Done=
=Done=
*Cleaned and panted the radiators.  
*Cleaned radiators.
*Painted radiators.  
*Filled a lot of the cracks and holes.
*Filled a lot of the cracks and holes.
*Repainted all the walls.
*Repainted all the walls.
*Repainted the stairs.
*Replaced all the light switch covers.
*Replaced all the outlet covers.
*Insulated all the light switches.
*Insulated all the outlets.

Revision as of 19:33, 12 January 2023

Before and After Pics

GF1.png
GF2.png

Things Needed

Long Term

  • Floor - The floor is in bad shape and needs to be replaced.
  • Ceiling - The acoustic tiles will have to be removed and the ceiling repaired or replaced.
  • Over head light - We need to get a chandelier for this room. Right now there is a modern fixture in its place.

Done

  • Cleaned radiators.
  • Painted radiators.
  • Filled a lot of the cracks and holes.
  • Repainted all the walls.
  • Repainted the stairs.
  • Replaced all the light switch covers.
  • Replaced all the outlet covers.
  • Insulated all the light switches.
  • Insulated all the outlets.