Grand Foyer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
=Before and After Pics= | =Before and After Pics= | ||
[[File:GF1.png|centre| | [[File:GF1.png|centre|640px]] | ||
[[File:GF2.png|centre| | [[File:GF2.png|centre|640px]] | ||
=Things Needed= | =Things Needed= | ||
Line 11: | Line 11: | ||
=Done= | =Done= | ||
*Cleaned | *Cleaned radiators. | ||
*Painted radiators. | |||
*Filled a lot of the cracks and holes. | *Filled a lot of the cracks and holes. | ||
*Repainted all the walls. | *Repainted all the walls. | ||
*Repainted the stairs. | |||
*Replaced all the light switch covers. | |||
*Replaced all the outlet covers. | |||
*Insulated all the light switches. | |||
*Insulated all the outlets. |
Revision as of 19:33, 12 January 2023
Before and After Pics
Things Needed
Long Term
- Floor - The floor is in bad shape and needs to be replaced.
- Ceiling - The acoustic tiles will have to be removed and the ceiling repaired or replaced.
- Over head light - We need to get a chandelier for this room. Right now there is a modern fixture in its place.
Done
- Cleaned radiators.
- Painted radiators.
- Filled a lot of the cracks and holes.
- Repainted all the walls.
- Repainted the stairs.
- Replaced all the light switch covers.
- Replaced all the outlet covers.
- Insulated all the light switches.
- Insulated all the outlets.