Vestibule: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Changes and Repairs= | =Changes and Repairs= | ||
*Front Door - Needs to be redone or replaced | *'''Front Door''' - Needs to be redone or replaced | ||
*Door into fourier - Not sure if it is even there. ('''Unknown''') | *'''Door into fourier''' - Not sure if it is even there. ('''Unknown''') | ||
*Shelf needs to be added in the Closet | *'''Shelf''' - needs to be added in the Closet | ||
*Walls - Unknown | *'''Walls''' - Unknown | ||
*Ceiling - Unknown | *'''Ceiling''' - Unknown | ||
*Light - Unknown | *'''Light''' - Unknown | ||
*Floor - I think it is stick on tile. | *'''Floor''' - I think it is stick on tile. | ||
=Long Term= | |||
*'''Floor''' - Would like to replace with white tile later. | |||
*'''Front Door''' - Replace. | |||
*'''Door into fourier''' - Replace. | |||
=Done= |
Latest revision as of 14:36, 13 October 2022
This is the main entry to the house.
Things Needed
- Double curtain rods - Need to measure the window.
- Curtains Shears
- Curtains Blackout
- $128.00 Closet Doors - We will need to measure the door opening before we get a firm price but this is the style. The doors where removed or never installed.
- 2 x $86.39 Shoe Benches - To provide a place for people to take off their shoes before entering the house.
Changes and Repairs
- Front Door - Needs to be redone or replaced
- Door into fourier - Not sure if it is even there. (Unknown)
- Shelf - needs to be added in the Closet
- Walls - Unknown
- Ceiling - Unknown
- Light - Unknown
- Floor - I think it is stick on tile.
Long Term
- Floor - Would like to replace with white tile later.
- Front Door - Replace.
- Door into fourier - Replace.