Vestibule: Difference between revisions

From 30 Elm St Potsdam NY
Jump to navigation Jump to search
No edit summary
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Changes and Repairs=
=Changes and Repairs=
*Front Door - Needs to be redone or replaced
*'''Front Door''' - Needs to be redone or replaced
*Door into fourier - Not sure if it is even there.  ('''Unknown''')
*'''Door into fourier''' - Not sure if it is even there.  ('''Unknown''')
*Shelf needs to be added in the Closet
*'''Shelf''' - needs to be added in the Closet
*Walls - Unknown
*'''Walls''' - Unknown
*Ceiling - Unknown
*'''Ceiling''' - Unknown
*Light - Unknown
*'''Light''' - Unknown
*Floor - I think it is stick on tile. Would like to replace with white tile later.
*'''Floor''' - I think it is stick on tile.
 
=Long Term=
*'''Floor''' - Would like to replace with white tile later.
*'''Front Door''' - Replace.
*'''Door into fourier''' - Replace.
 
=Done=

Latest revision as of 14:36, 13 October 2022

Vestibule.png


This is the main entry to the house.

Things Needed

  • Double curtain rods - Need to measure the window.
  • Curtains Shears
  • Curtains Blackout
  • $128.00 Closet Doors - We will need to measure the door opening before we get a firm price but this is the style. The doors where removed or never installed.

BiFoldDoors.png

  • 2 x $86.39 Shoe Benches - To provide a place for people to take off their shoes before entering the house.

Shoebox.png

Changes and Repairs

  • Front Door - Needs to be redone or replaced
  • Door into fourier - Not sure if it is even there. (Unknown)
  • Shelf - needs to be added in the Closet
  • Walls - Unknown
  • Ceiling - Unknown
  • Light - Unknown
  • Floor - I think it is stick on tile.

Long Term

  • Floor - Would like to replace with white tile later.
  • Front Door - Replace.
  • Door into fourier - Replace.

Done