Repairs: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=Basement= | =Basement= | ||
* Unfinished | * [[Unfinished Basement]] | ||
* Bathroom (urinals only, Will be converted to full bathroom) | * [[Basement Bathroom|Bathroom]] (urinals only, Will be converted to full bathroom) | ||
* Cellar off the main basement | * [[Cellar]] off the main basement | ||
* Few small rooms - (need to account for when we get there) | * [[Few small rooms - (need to account for when we get there) | ||
(Will finish the basement at latter date) | (Will finish the basement at latter date) | ||
Revision as of 22:00, 16 October 2022
Basement
- Unfinished Basement
- Bathroom (urinals only, Will be converted to full bathroom)
- Cellar off the main basement
- [[Few small rooms - (need to account for when we get there)
(Will finish the basement at latter date)
First Floor
- Vestibule
- Mud Room
- Grand Foyer
- Back Foyer
- Formal Dining Room
- Kitchen
- Office
- Tea Room
- Bathroom
- Grand Living Room with tower sitting room.
Second Floor
- Second Floor Lounge (small porch)
- Bathroom
- Room 1 - Master Bed Room (with tower sitting room and small porch)
- Room 2 - Empty Room (With Fireplace)
- Room 3 - Empty Room (With tower sitting room)
- Room 4 - Streaming Room
- Room 5 - Theater Room
- Room 6 - Permanent Guest Room
Third Floor
- Third Floor Lounge
- Room 7 - Permanent Guest Room
- Room 8 - (With tower sitting room at some point will be a 3rd floor patio)
- Room 9 - Empty Room
- Room 10 - Empty Room (With tower sitting room)
- Room 11 - Empty Room
- Room 12 - Empty Room
(one of the bedrooms will be converted to a full bathroom)
Fourth Floor
- Unfinished 4th floor
(Will build out at a latter date)
Priority Repairs
- Basement Door!!!!
- Basement Support
- Vestibule Door (Outside Door)
- Curtains, Rods and 1st Floor Doors
- Outside Door
Tools
Notes
23 Windows 1st floor
19 2nd floor
16 3rd floor
2 4th floor