Repairs: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=Priority Repairs= | =Priority Repairs= | ||
*Internet | *[[Internet]] | ||
*Basement Door!!!! | *Basement Door!!!! | ||
*Rusted Column in Basement | *Rusted Column in Basement |
Revision as of 02:30, 21 October 2022
Priority Repairs
- Internet
- Basement Door!!!!
- Rusted Column in Basement
- Basement Support
- Curtains, Rods at least for the 1st Floor Doors
Basement
- Unfinished Basement
- Bathroom (urinals only, Will be converted to full bathroom)
- Cellar off the main basement
- Few small rooms - (need to account for when we get there)
(Will finish the basement at latter date)
First Floor
- Vestibule
- Mud Room
- Grand Foyer
- Back Foyer
- Formal Dining Room
- Kitchen
- Office
- Tea Room
- Bathroom
- Grand Living Room with tower sitting room.
- Back Hallways
Second Floor
- Second Floor Lounge (small porch)
- Bathroom
- Room 1 - Master Bed Room (with tower sitting room and small porch)
- Room 2 - Empty Room (With Fireplace)
- Room 3 - Empty Room (With tower sitting room)
- Room 4 - Streaming Room
- Room 5 - Theater Room
- Room 6 - Permanent Guest Room
Third Floor
- Third Floor Lounge
- Room 7 - Permanent Guest Room
- Room 8 - (With tower sitting room at some point will be a 3rd floor patio)
- Room 9 - Empty Room
- Room 10 - Empty Room (With tower sitting room)
- Room 11 - Empty Room
- Room 12 - Empty Room
(one of the bedrooms will be converted to a full bathroom)
Fourth Floor
- Unfinished 4th floor
(Will build out at a latter date)
Tools Needed
Notes
23 Windows 1st floor
19 2nd floor
16 3rd floor
2 4th floor