Repairs: Difference between revisions

From 30 Elm St Potsdam NY
Jump to navigation Jump to search
Line 25: Line 25:
*[[First Floor Bathroom|Bathroom]]
*[[First Floor Bathroom|Bathroom]]
*[[Grand Living Room]] with tower sitting room.
*[[Grand Living Room]] with tower sitting room.
*[[Back Hallways]]


=Second Floor=
=Second Floor=

Revision as of 01:59, 21 October 2022

Priority Repairs

  • Basement Door!!!!
  • Rusted Column in Basement
  • Basement Support
  • Vestibule Door (Outside Door)
  • Curtains, Rods and 1st Floor Doors
  • Outside Door

Basement

  • Unfinished Basement
  • Bathroom (urinals only, Will be converted to full bathroom)
  • Cellar off the main basement
  • Few small rooms - (need to account for when we get there)

(Will finish the basement at latter date)

First Floor

Second Floor

Third Floor

(one of the bedrooms will be converted to a full bathroom)

Fourth Floor

  • Unfinished 4th floor

(Will build out at a latter date)

Tools Needed

Notes

23 Windows 1st floor
19 2nd floor
16 3rd floor
2 4th floor